Residents of five villages in the Gora area, located in the municipality of Maliq, mobilized to demonstrate their opposition to the construction of a hydroelectric plant. The protest specifically concerns the planned water abstraction from local streams, watercourses considered indispensable for sustaining agricultural activities and livestock farming in the area.

According to reports by the Albanian broadcaster RTSH, members of civil society also voiced strong concerns regarding the environmental consequences of the project. Environmentalist Sazan Guri warned that the intervention could risk seriously damaging the ecosystem fed by the four streams involved, with negative repercussions also on the groundwater tables supplying the wells.

Civic representative Brizida Gjikondi denounced alleged irregularities in the assessments of the project, arguing that adequate studies on the native fauna and vegetation of Gora were not conducted, in addition to a lack of consultation with the inhabitants. The population reiterates indeed that water resources are a vital element for the economy of the entire mountain area.

For his part, investor Eri Agolli clarified to RTSH that he had already abandoned an initial configuration following the complaints raised by the villages of Kolanec and Goça. The developer explained that the permits issued in 2018 have expired and that the bureaucratic and environmental process is currently undergoing renewal with appropriate design modifications.