RALUMO · RTSH
Albania: government plan ready for flood risk management in river basins
The government of Albania has prepared a draft decision to standardize flood risk management. The initiative aligns local rules with EU Directive 2007/60/EC through preliminary assessments, color-coded maps, and six-month public consultations for every river basin in the Balkan country.

Tools
The Council of Ministers of Albania has prepared a regulatory proposal to introduce uniform criteria for the protection of water resources and flood defense. According to broadcaster RTSH, the measure implements the 2024 law on the sector and aligns the national framework with European Directive 2007/60/EC, integrating into the National Plan for European Integration 2025-2027 without requiring additional financial burdens on the public budget.
Operational responsibility falls to the Water Resources Management Agency, known by the acronym AMBU, which will work alongside other institutions, repealing certain provisions introduced in 2020. The agency will conduct preliminary assessments for each river basin, taking into account the impact of climate change. Following these analyses, the government will formally designate areas exposed to risk after approval from the National Council of the Territory and Water.
The plan includes the creation of detailed risk maps, differentiated using specific color shades and coordinated through timelines defined by Gantt-type charts. The agency will draw up management programs in collaboration with various ministries, including environment, agriculture, defense, infrastructure, and civil emergencies, as well as with prefectures and municipalities, establishing preventive measures against accidental spills of hazardous materials and requiring transparency regarding previously uncompleted actions.
Before operational launch, the project establishes a mandatory public consultation phase open for six months to residents, associations, and potentially neighboring nations for shared watercourses. The drafts will be published one year before their entry into force and subjected to a strategic environmental assessment. At least six months before final implementation, the body will incorporate the collected feedback to submit the definitive text for approval by the Council of Ministers.
Sources and references
RTSH ↗ · Source date